TOP STORIES

Replacing Automatic Meter Reading (AMR) with Advanced Metering Infrastructure (AMI) System System

Replacing Automatic Meter Reading (AMR) with Advanced Metering Infrastructure (AMI) System System

Sponsored
Off

Off

bcrossen
December 28, 2020

By Line
By Matt Zellers

Change from automatic meter reading (AMR) to advanced metering infrastructure (AMI) results in 65% drop in labor as well as daily read accuracy up to 99.6%

City of Sheridan, Wyoming saves big on labor costs by changing from AMR to AMI.

About The Author

Matt Zellers is territory manager for Mueller Systems. Zellers can be reached at mzellers@muellerwp.com.

Company Reference

Pumps
Author: Pumps

Leave a Reply